Trimet-FLOW METERING UPGRADES
Trimet successfully completing the metering system upgrades, which is installed 10 years back to the plant. Most of the old metering system existing in plant having no updated cyber security. More over the existing analyzers and flow meters are obsolete so Firmware up gradation is necessary for most of the 10 years old metering system at different Plant.
In order to achieve redundancy in PLC and Customized during deployment to meet each site’s needs for data collection and information access. Trimet having major OEM trained Site Engineers to full fill the system up gradation plan in line with plant shutdown.